TEAM
OWNER
City of Beaverton Police Department
ARCHITECT
FFA Architecture
STRUCTURAL ENGINEER
KPFF Consulting Engineers
GENERAL CONTRACTOR
Skanska
OUR ROLE
- Turnkey Mass Timber Supply & Install Sub Contractor
HIGHLIGHTS
This 81,000-square-foot, three-level project features a structural steel frame with 56,000-square-feet of Cross Laminated Timber (CLT) floors and roof diaphragm with a BRBF lateral system. The city is to complete its new earthquake-resistant police and emergency management building. Swinerton is providing timber engineering services on the project for the Mass Timber/CLT scope.
- Construction Type V-B
- Typical Grid | 20′ x 27′
- Expected Completion | Summer 2020
Renderings: FFA Architecture | Photo credit: BREWSPHOTO LLC and Swinerton